Is your old biomass boiler no longer performing as efficiently as it once did? Now is the perfect time to upgrade with Zero Ridge’s exclusive biomass boiler scrappage scheme. We are offering the opportunity to trade in your old biomass boiler and replace it with a new, high-quality HDG Bavaria boiler, built and designed in Germany. However, please note that old HDG boilers are not eligible for this scrappage scheme.
With nearly 50 years of experience in manufacturing wood boilers, HDG Bavaria leads the industry in precision engineering and environmental performance. By upgrading, you'll enjoy improved energy efficiency, reduced running costs, and contribute to a more sustainable future.
1. Increased Efficiency and Performance
Older biomass boilers tend to lose efficiency, burning more fuel for the same amount of heat. Upgrading to a new HDG boiler provides modern technology advantages like intelligent combustion controls, improved fuel efficiency, and consistent heating. HDG boilers are engineered to deliver maximum performance with low emissions.
2. Reduce Your Carbon Footprint
Upgrading to an HDG biomass boiler reduces your environmental impact by lowering emissions. HDG’s latest models feature advanced combustion processes, making them a cleaner and greener option. By participating in the scrappage scheme, you actively reduce greenhouse gases and support renewable energy.
3. Save on Running Costs
Old systems often require more fuel to generate heat. With a new HDG boiler, you will reduce your energy consumption, translating to lower fuel costs. These savings help offset the initial cost of the new system and provide long-term financial benefits.
4. Extended Warranties
HDG boilers come with extended warranties of up to 10 years, offering you complete peace of mind. With nearly 50 years of wood boiler building experience, HDG is known for reliability and performance.
5. Government Incentives
You may also be eligible for Government incentives, such as the Renewable Heat Incentive (RHI), which rewards you for producing renewable heat. Installing a new HDG boiler will allow you to maximize participation in these programs, reducing your costs further.
Step 1: Assessment of Your Existing Boiler
Contact our team to schedule an assessment of your current biomass boiler. We’ll evaluate the age, condition, and efficiency of your system to determine eligibility for the scrappage scheme.
Please note: old HDG boilers are not included.
Step 2: Receive a Buyback Offer
Once your boiler is assessed, we will offer you a buyback value for your old system. This amount can be put directly towards the purchase of a new HDG Bavaria boiler.
Step 3: Choose Your New HDG Boiler
With a wide range of high-performance HDG boilers, we’ll help you select the ideal model for your heating needs. Whether for domestic or commercial applications, HDG boilers are known for their durability, efficiency, and low emissions. With UK system design and commissioning by Zero Ridge, your new boiler will be tailored to your specific requirements.
Step 4: Professional Installation
Our team of approved engineers will handle the removal of your old biomass boiler and install your new HDG system, ensuring it operates at peak performance from day one. With over 100 years of combined experience in biomass systems, we ensure a seamless installation process.
Step 5: Enjoy the Benefits
Once installed, your new HDG boiler will immediately provide improved efficiency, lower running costs, and a reduced environmental impact. Join the 1,000s of happy customers who have already experienced the benefits of HDG’s advanced biomass technology.
HDG Bavaria has been building wood boilers for nearly 50 years, with a reputation for precision engineering, environmental performance, and advanced combustion controls. These boilers provide:
By upgrading to a new HDG boiler through our scrappage scheme, you’re investing in the future of your property and the environment.
Don’t wait until your old biomass boiler becomes inefficient or breaks down. Upgrade today with Zero Ridge’s scrappage scheme, and receive a buyback for your old boiler. Please note that old HDG boilers are not included in this scheme.
At Zero Ridge, we are dedicated to helping our customers transition to more cost-effective and sustainable heating solutions. Contact us today to find out more about the scrappage scheme and begin your journey towards a cleaner, greener, and more efficient heating future.
If you are interested in discussing your situation further, then please call us on